Continued Infrastructure Improvement on Rock Creek Church Road, NW

The resurfacing of Rock Creek Church Road, NW, continued last week with the 700 and 800 blocks. By the end of the week, the entire length of the street between Georgia Avenue and Park Place had been completed.

Based on the orange netting around the trees and the marks on the sidewalk along the 700 block, I’m guessing that sidewalk repair will commence this week.

Share

Explore posts in the same categories: Streets and Trees

Tags: , ,

You can comment below, or link to this permanent URL from your own site.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s


%d bloggers like this: